3/5/2013

Standard
Next to do: Trim back the stove counter plywood to fit the metal in the front as it overlaps, glue down all the metal to the plywood, secure the main faucet with valves. I need to stop at RS for a couple flex hoses, 50 cents instead of $5 each. I just put the valve in the car, sure is raining. The heater will need extender brackets to keep it 2″ off the wall. I think I have enough iron for that.
The plumbing needs to go in from the pump to the sinks hot and cold lines including a city supply with shut off valves. A huge amount of details in that last sentence. I think we have enough fittings.
You have a ton of finish work to do. That water base clear coat is a godsend.

One response »

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s